Dylan Patel · a16z · 18 August 2025
“It's the GPU purchases. It's the networking. It's the it's the physical data center conversion power conversion equipment. All of this stuff is, like, 80% of the cost.”
Verbatim excerpt with a timestamp. The full recording is at the source; we link out and do not host it. Everything Dylan Patel is on record saying.