Bill Gurley · Bg2 Pod · 9 September 2024
“We recently brought on two new plants in The U. S. Vogtle three and four in And the total cost of that was about 30,000,000,000 for 2.2 gigawatts. It turns out over $13,000,000,000 per gigawatt.”
Verbatim excerpt with a timestamp. The full recording is at the source; we link out and do not host it. Everything Bill Gurley is on record saying.