David Sacks · All-In Podcast · 10 October 2025
“Here's a rule of thumb is that each gigawatt data center is about $50,000,000,000 of investment, roughly. Between the chips, the land power shell, it's about 50,000,000,000 per gigawatt.”
Verbatim excerpt with a timestamp. The full recording is at the source; we link out and do not host it. Everything David Sacks is on record saying.